For subcontractors

The plans, the pricing form and the daily log, in one place, for free

You did not pick the GC's software, and you should not pay for it. When a general contractor on VersiBuild invites you, you get a portal with everything for that job.

  • Chasing the current drawing revision through an email thread
  • Pricing a package in a reply and losing track of which number you sent
  • Re-typing the daily log because the GC's form is not yours
Sub portal · Herrera Electric LLC · working for Ridgeline Builders
LH
Welcome back, Luis
Herrera Electric LLC · Assigned Projects 2 · Total Tasks 4 · Recent Logs 3
Prequal approved
Larkspur Medical Office Building

RB-2603 · Interiors L2 · PM Anne Walsh

Exam rooms 204–211 box rough65%
Feeder pull to LP-230%
Boise Bench Townhomes

RB-2612 · Pre-construction

Bid request #BR-0193 · Electrical, 12 units

Requesteddue Sep 24, 2026
The portal

What Herrera Electric sees on a Ridgeline job

Bid Requests with its Revisions Needed filter, the Send pricing form, the daily log and the documents the GC shared with you. Nothing else, and nothing from other subs.

Bid Requests · 4
Ridgeline Builders — Boise Bench Townhomes — Electrical, 12 unitsRequested

Request #BR-0193 · invited Aug 28, 2026 · due Sep 24, 2026 · amount Pending

“Rev 2 drawings attached. Include service upgrade to 400A; exclude solar rough-in (alternate).”

Ridgeline Builders — Larkspur MOB — Low-voltage / data cablingRevision requested

Request #BR-0181 · prior amount $48,200

Cascade Peak Builders — Star Retail Pad — ElectricalAwarded

Request #BR-0176 · $212,400

Ridgeline Builders — Capitol Blvd TI — ElectricalReceived

Request #BR-0142 · $61,750

Send pricing · #BR-0193
Base bid
$135,000
Alternate: solar rough-in
$18,400
Exclusions and notes
Includes 400A service upgrade. Excludes trenching beyond 5' of building.
HE-proposal-BR-0193.pdf · 1 file
Bid Requests · Revisions Needed · 1
Revisions Needed · 1
A filter on Bid Requests, not a separate page.
#BR-0181Larkspur MOB — Low-voltage / data cabling

GC note: “Please break out patch panels and re-price with Cat6A.”

Prior amount $48,200
Daily Logs · Larkspur MOB · Sep 2, 2026
2026-09-0284°F · ClearCrew 5Open

Exam rooms 206–209 box rough; pulled feeders to LP-2

Aug 26 was logged as a Rain out day by the GC; your crew of 6 that day billed nothing.
Documents · shared with Herrera Electric LLC
01 Drawings / E-series

Larkspur MOB · 7 files · E-401 rev 3 updated Aug 30, 2026

03 Submittals / Electrical

Larkspur MOB · 2 files · SUB-039 lighting cut sheets Pending

Bid documents

Boise Bench Townhomes · 4 files · rev 2 drawings for #BR-0193

Free for subs

No seat fee. Not on any GC's plan, not ever.

The GC pays for their internal seats. The portal for their subcontractors and clients is included on every plan, unlimited.

A bid invite looks like thisOpen bid request for Boise Bench Townhomesfrom Ridgeline Builders · sent to luis@herreraelectric.com · due Sep 24, 2026
No account needed for either
  • Accept the invite by email or a short link. The link is bound to your address. You can answer Interested or Not bidding straight from the invite page, before you ever create an account.
  • Price it in a form, not a reply. Base bid, alternates, exclusions and an attachment. The GC sees your number next to the others; you see only yours.
  • File your own daily log. Weather is filled from the site record. Use a voice note if you are driving. Your logs are yours and go into the GC's dispute pack only for your scope.
  • One prequalification, every GC on VersiBuild. Insurance, license, EMR and bonding stay on your profile. When the workers' comp certificate is 90 days from expiring, you get told before the GC does.

Got an invite? Open it.

If a GC sent you a bid request, the link in that email is the whole sign-up. If you are the GC, book the walkthrough.